Close Menu
Eden Prairie Local News
    Facebook X (Twitter) Instagram
    Wednesday, June 11
    • About
      • About EPLN
      • Team
      • EPLN in the News
      • Policies
    • Contact
    Facebook X (Twitter) Instagram Threads LinkedIn
    Subscribe
    Eden Prairie Local News
    • Home
    • Schools
    • Business
    • Sports
    • Public Safety
    • City
    • Calendar
    • Subscribe
    • Donate
    • More
      • Construction
      • Outdoors
      • Politics
      • Health
      • Spirituality
      • Community Service
      • Legacy
      • Obituaries
      • Arts
      • Family
      • Holidays
      • Letter to Editor
      • Listen
      • Jobs
    Eden Prairie Local News
    Home»Construction»Highway 101 fully open in EP and Chanhassen
    Construction

    Highway 101 fully open in EP and Chanhassen

    EPLN Staff ReportsBy EPLN Staff ReportsNovember 25, 2024Updated:November 25, 20241 Min Read

    Highway 101 between County Road 62/Townline Road in Eden Prairie and Highway 5 in Chanhassen has fully reopened. The road has been closed to non-local traffic since June.

    During this timeframe, Minnesota Department of Transportation (MnDOT) crews resurfaced two miles of the road; reconstructed the trail on the west side of the road; installed overhead pedestrian signals at Twilight Trail and Valley View Road; repaired Purgatory Creek drainage issues; and built accessible pedestrian crossings and curb ramps. 

    The project entailed adding curb ramps compliant with the Americans with Disabilities Act at Highway 101’s intersections with South Shore Drive, Twilight Trail, Kurvers Point Road, Cheyenne Trail, Sandy Hook Road, Choctaw Circle, Fox Hollow Drive, and Pleasantview Road. Traffic signals with raised arrows and speakers, intended to provide information about the intersection to pedestrians with hearing and visual impairment, were installed at Highway 101’s intersections with Highway 5 and West 78th Street. 

    In spring 2025, crews will return to complete pavement markings and finish remaining work on the adjacent trail. Find more information on MnDOT’s Highway 101 project page.

    Advertisement
    Ad for Washburn McReavy

    Comments
    We offer several ways for our readers to provide feedback. Your comments are welcome on our social media posts (Facebook, X, Instagram, Threads, and LinkedIn). We also encourage Letters to the Editor; submission guidelines can be found on our Contact Us page. If you believe this story has an error or you would like to get in touch with the author, please connect with us.

    Be Informed
    Sign up for the FREE email newsletter from EPLN
    Subscribe
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleLame duck trifecta action via a special legislative session? Minnesota DFL leaders signal there’s no such plan
    Next Article Walter Frank Broich IV

    More to READ

    1 Min Read

    Road construction on Pioneer Trail begins June 11

    June 9, 2025
    2 Mins Read

    MnDOT to start major Highway 212 and 5 repairs in Eden Prairie June 12

    June 8, 2025
    1 Min Read

    Highway 101 lane closures postponed due to rain

    June 3, 2025
    Subscribe to get EPLN in your inbox for FREE!
    Recent Articles

    Jazz and barbecue make a solid combo platter in Eden Prairie

    June 10, 2025

    Stephen Germain Born

    June 10, 2025

    City wants Danfoss industrial site redeveloped for residential, retail and office

    June 10, 2025

    Defying the odds, Minnesota youth rowers head to nationals

    June 10, 2025

    National Merit college scholarship winners named

    June 10, 2025
    • Facebook
    • Twitter
    • Instagram
    • LinkedIn
    INN Network Member Guidestar Seal
    Eden Prairie Local News is a 501(c)(3) nonprofit organization EIN 85-4248265 | Copyright © 2020-2025
    • About
    • Policies
    • Jobs
    • Contact
    • Advertising
    • Subscribe
    • Donate

    Type above and press Enter to search. Press Esc to cancel.