Close Menu
Eden Prairie Local News
    Facebook X (Twitter) Instagram
    Saturday, July 5
    • About
      • About EPLN
      • Team
      • EPLN in the News
      • Policies
    • Contact
    Facebook X (Twitter) Instagram Threads LinkedIn
    Subscribe
    Eden Prairie Local News
    • Home
    • Schools
    • Business
    • Sports
    • Public Safety
    • City
    • Calendar
    • Subscribe
    • Donate
    • More
      • Construction
      • Outdoors
      • Politics
      • Health
      • Spirituality
      • Community Service
      • Legacy
      • Obituaries
      • Arts
      • Family
      • Holidays
      • Letter to Editor
      • Listen
      • Jobs
    Eden Prairie Local News
    Home»Construction»Baker Road pavement work begins late August
    Construction

    Baker Road pavement work begins late August

    EPLN Staff ReportsBy EPLN Staff ReportsAugust 22, 20241 Min Read
    Abobe Stock Image

    Hennepin County is set to begin pavement improvements on Baker Road (County Road 60) between Fairway Drive in Eden Prairie and Interstate 494 in Minnetonka.

    The work, scheduled for late August, includes applying a surface treatment to rejuvenate the existing pavement, making the road safer for drivers.

    Crews will work on one side of the road at a time, with flaggers directing traffic through the work zone in one direction at a time. Drivers should stay alert and be prepared for delays.

    This project is part of a larger effort to refresh several roads across the county. The schedule depends on weather, with each section expected to take two to three days. All dates are tentative and could change.

    Advertisement
    Ad for Washburn McReavy

    During the process, workers will apply a surface treatment that might stay sticky for a few hours, followed by a coating of limestone sand. If your driveway connects directly to the work area, be aware that driving over the fresh treatment could leave marks on light-colored concrete. Crews will return a day or two later to sweep up any leftover sand.

    For more information, email transportation@hennepin.us.

    Comments
    We offer several ways for our readers to provide feedback. Your comments are welcome on our social media posts (Facebook, X, Instagram, Threads, and LinkedIn). We also encourage Letters to the Editor; submission guidelines can be found on our Contact Us page. If you believe this story has an error or you would like to get in touch with the author, please connect with us.

    Be Informed
    Sign up for the FREE email newsletter from EPLN
    Subscribe
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleMarshall’s Farm Market is keeping on
    Next Article Concrete piles at EP interchange related to MnDOT construction outside the city

    More to READ

    1 Min Read

    Road construction on Pioneer Trail begins June 11

    June 9, 2025
    2 Mins Read

    MnDOT to start major Highway 212 and 5 repairs in Eden Prairie June 12

    June 8, 2025
    1 Min Read

    Highway 101 lane closures postponed due to rain

    June 3, 2025
    Subscribe to get EPLN in your inbox for FREE!
    Recent Articles

    D.C. Memo: In wake of Trump’s big win, Minnesota GOPers downplay Medicaid cuts while Dems decry them

    July 4, 2025

    Campus Honor Roll

    July 4, 2025

    Peter Olin, who led Minnesota Landscape Arboretum for 24 years, dies at 87

    July 3, 2025

    Camp Eden Wood eyes site improvements while celebrating 100-year history

    July 3, 2025

    Eden Prairie sting leads to 10 felony charges, two cases pending

    July 3, 2025
    • Facebook
    • Twitter
    • Instagram
    • LinkedIn
    INN Network Member Guidestar Gold Seal
    Eden Prairie Local News is a 501(c)(3) nonprofit organization EIN 85-4248265 | Copyright © 2020-2025
    • About
    • Policies
    • Jobs
    • Contact
    • Advertising
    • Subscribe
    • Donate

    Type above and press Enter to search. Press Esc to cancel.