Eden Prairie Local News
    Facebook Twitter Instagram
    Friday, July 1
    • About
      • About EPLN
      • Team
      • EPLN in the News
      • Policies
    • Contact
    Facebook Twitter Instagram
    Subscribe
    Eden Prairie Local News
    • Home
    • Politics
    • Schools
    • Business
    • Construction
    • Sports
    • Outdoors
    • City
    • Calendar
    • Donate
    • Subscribe
    • More
      • Health
      • Spirituality
      • Community Service
      • Legacy
      • Obituaries
      • Arts
      • Family
      • Holidays
      • Letter to Editor
      • Listen
      • Jobs
    Eden Prairie Local News
    Home»Construction»Everything but the fence: Minnesota River Bluffs LRT Regional Trail poised to reopen
    Construction

    Everything but the fence: Minnesota River Bluffs LRT Regional Trail poised to reopen

    By Brad CanhamDecember 15, 2020Updated:December 15, 20203 Mins Read
    Awaiting fencing for safety reasons, the embankment repair on the Minnesota River Bluffs LRT Regional Trail between Pioneer Road and Great Plains Boulevard includes a new 20+ foot dip to stabilize the slopes. Photo credit- Brad Canham

    The delay in receipt of a required safety fence has Kristine Stehly checking her email daily.

    Stehly is the project manager for the Hennepin County Regional Railroad Authority who is coordinating the re-opening of Minnesota River Bluffs LRT Regional Trail between Pioneer Trail and Great Plains Boulevard (101).

    Originally closed in 2014 due to heavy rains which destabilized the former railroad embankment the trail reopening was near completion in November of 2020.

    Then, COVID complications hit at the fencing manufacturer.

    Advertisement
    Ad for Washburn-McReavy

    The fencing manufacturer, American Fencing, Kansas City, is citing COVID-19 as the reason for a delay in receipt of the vinyl-coated fencing bordering the trail, said Stehly.

    “Any day now,” said Stehly, noting installation of the fence will take a “week or two.”

    The fencing is not continuous and will include 6-foot and 4-foot high sections depending on the slope of the trail and the slope of the embankment.

    The area of the repair includes a widening and lowering of the trail from the original steep embankment. “If it was being built today it wouldn’t have been built the way it originally was,” noted Stehly.

    Over 300 trees, including red oak, were planted along the embankment slope as part of repairs to the Minnesota River Bluffs LRT Regional Trail. Photo credit – Brad Canham

    As part of the embankment stabilization, the trail has been widened and “lowered by over 20 feet” said Stehly.

    The 4-foot high section will be used where the trail embankment repair provides an overlook to the south towards a church and ValleyFair amusement park in Shakopee, said Stehly.

    The fence is for “safety reasons,” said Stehly who is cautiously optimistic that a “quiet open” can still happen in December of 2020.

    “Cross your fingers, the fence will come in,” Stehly said.

    One part of trail reopening, another part of trail likely to close

    Unfortunately, noted Stehly, even as the section of the trail between Pioneer and Great Plains Boulevard is expected to open soon, another section of the Minnesota River Bluffs LRT Regional Trail in Eden Prairie is likely to close.

    Stehly anticipates additional project work, due to a destabilized culvert due to detached culvert wingwalls near Prairie View Road, will likely necessitate another closure of a section of the trail for repair.

    A repair without closing the trail may be possible. However, direct access to the trail for repair work is more complicated when property owners adjacent to the trail are involved, noted Stehly.

    The goal is to complete the culvert work and reopen the trail area near Valley View Road this winter prior to the heavier summer use of the trail, said Stehly.

    Subscribe to EPLN for FREE!
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleVFW food drive this Saturday
    Next Article 2021-22 EP school start time recommendations; comments sought

    More to READ

    5 Mins Read

    Are you ready for some patriotic revelry?

    June 30, 2022
    1 Min Read

    Meet your Eden Prairie Local News team

    June 29, 2022
    2 Mins Read

    Sign up for a light rail construction site tour

    June 19, 2022
    View 1 Comment

    1 Comment

    1. Pingback: Eden Prairie Local News (EPLN) top 10 stories of 2020 - Eden Prairie Local News

    Subscribe to get EPLN in your inbox for FREE!
    Recent Articles

    Are you ready for some patriotic revelry?

    June 30, 2022

    Hennepin County Attorney candidates state their case at League of Women Voters forum

    June 30, 2022

    Major residential street repaving project beginning July 5 in western EP and Franlo in east

    June 30, 2022

    Weber looks back on his 43 years of helping make a difference for Eden Prairie residents

    June 30, 2022

    Meet your Eden Prairie Local News team

    June 29, 2022
    LETTERS TO THE EDITOR

    LETTERS TO THE EDITOR are welcome.

    Send letters, which have not been published elsewhere, to editor@eplocalnews.org.

    Letters may be up to 250 words and can also include pictures. Indicate clearly that you would like to share your letter with EPLN readers.

    • Facebook
    • Twitter
    • Instagram
    Eden Prairie Local News is a 501(c)(3) nonprofit organization EIN 85-4248265 | Copyright © 2020-2022
    • About
    • Policies
    • Jobs
    • Contact
    • Advertising
    • Subscribe
    • Donate

    Type above and press Enter to search. Press Esc to cancel.